2013 Volusia County Artificial Reef Deposits

Updated 10/2/13



site 6 north deposit 6/9/13     Site 6 NNW deposit 7/18/13

Site 6 on 6/10/2013 (left) and 7/18/2013 (right)

On 5/24/13, a deposit was made on the western part of Site 2 at 2909.394'N, 8040.961'W. A barge load of clean concrete culverts was deposited in two lines from both sides of the barge. The height of the deposit is approximately 9 feet. The depth on Site 2 is 75 feet.

On 6/4/13, a deposit was made on the southwestern part of Site 2 at 2909.095'N, 8040.972'W. A barge load of clean concrete culverts was deposited in two lines from both sides of the barge. The height of the deposit is approximately 6 feet. The depth on Site 2 is 75 feet.

On 6/8/13, a deposit was made on the NNW part of Site 12 at 2912.102'N, 8046.752'W. A barge load of clean concrete culverts was deposited from one side of the barge. The height of the deposit is approximately 7 feet. The depth on Site 12 is approximately 75 feet.

On 6/10/13, a deposit was made on the north part of Site 6 at 2903.376'N, 8043.184'W. A barge load of clean concrete culverts was deposited from one side of the barge. The height of the deposit is approximately 11 feet. The depth on Site 12 is approximately 60 feet.

On 6/12/13, a deposit was made on the northeast part of Site 7 at 2901.459'N, 8040.731'W. A barge load of clean concrete culverts was deposited from one side of the barge. The height of the deposit is approximately 8 feet. The depth on Site 7 is approximately 60 feet.

On 6/14/13, a deposit was made on the eastern part of Site 13 at 2910.128'N, 8041.167'W. A barge load of clean concrete culverts was deposited from the barge. The height of the deposit is approximately 11 feet. The depth on Site 13 is approximately 80 feet.

On 6/18/13, a deposit was made on the eastern part of Site 3 at 2911.670'N, 8044.462'W. A barge load of clean concrete culverts was deposited from one side the barge. The height of the pile is approximately 11 feet. The depth on Site 3 is approximately 75 feet.

On 6/20/13, a deposit was made on the northeastern part of Site 3 at 2911.974'N, 8044.506'W. A barge load of clean concrete culverts was deposited. The height of the pile is approximately 12 feet. The depth on Site 3 is approximately 75 feet.

On 6/22/13, a deposit was made on the SSE part of Site 10 at 2921.159'N, 8049.465'W. A barge load of clean concrete culverts was deposited. The height of the pile is approximately 9 feet. The depth on Site 10 is approximately 65 feet.

On 6/24/13, a deposit was made on the SE part of Site 1 at 2906.874'N, 8041.407'W. A barge load of clean concrete culverts was deposited. The height of the pile is approximately 8 feet. The depth on Site 1 is approximately 75 feet.

On 6/27/13, a deposit was made on the northern part of Site 10 at 2921.740'N, 8049.745'W. A barge load of clean concrete culverts was deposited. The height of the pile is approximately 9 feet. The depth on Site 10 is approximately 65 feet.

On 6/28/13, a deposit was made on the western part of Site 1 at 2907.152'N, 8042.026'W. A barge load of clean concrete culverts was deposited. The height of the pile is approximately 13 feet. The depth on Site 1 is approximately 75 feet.

On 7/1/13, a deposit was made on the NNE part of Site 2 at 2909.697'N, 8040.410'W. A barge load of approximately 1100 concrete railroad ties was deposited. The height of the pile is approximately 11 feet. The depth on Site 2 is approximately 75 feet.

On 7/8/13, a deposit was made on the NE part of Site 2 at 2909.563'N, 8040.409'W. A barge load of clean concrete culverts was deposited. The height of the pile is approximately 11 feet. The depth on Site 2 is approximately 75 feet.

On 7/8/13, a deposit was also made on the eastern part of Site 4 at 2919.286'N, 8044.354'W. A barge load of clean concrete material and culverts was deposited. The height of the pile is approximately 10 feet. The depth on Site 4 is approximately 80 feet.

On 7/12/13, a deposit was made on the northern part of Site 5 at 2907.475'N, 8044.354'W. A barge load of clean concrete culverts was deposited. The height of the deposit is approximately 16 feet. The depth on Site 2 is approximately 65 feet. This deposit was the 102nd Volusia County artificial fishing reef.

On June 17, 2010, the Volusia County Council set a goal to double The number of marine wildlife and artificial fishing reefs offshore Volusia County from 51 to 102. Council intent with this effort was marine industry economic development and marine habitat sustainability. On Friday, July 12, 2013 this goal was achieved as the 102nd Volusia County marine wildlife and artificial fishing reef was constructed at Volusia County reef site #5 north.

On 7/15/13, a deposit was made on the western part of Site 4 at 2919.268'N, 8044.990'W. A barge load of clean concrete material and culverts was deposited. The height of the deosit is approximately 11 feet. The depth on Site 4 is approximately 80 feet.

On 7/18/13, a deposit was made on the north-northwestern part of Site 6 at 2909.697'N, 8040.410'W. A barge load of clean concrete material and culverts was deposited. The height of the deposit is approximately 11 feet. The depth on Site 6 is approximately 60 feet.

On 7/20/13 a deposit was made on the north western part of Site 7 at 2901.446'N, 8041.286'W. A barge load of clean concrete culverts was deposited. The height of the deosit is approximately 10 feet. The depth on Site 7 is approximately 60 feet.

On 7/22/13 a deposit was made on the southern part of Site 5 at 2906.884'N, 8048.311'W. A barge load of clean concrete railroad ties was deposited. The height of the deosit is approximately 9 feet. The depth on Site 5 is approximately 65 feet.

On 7/24/13 a deposit was made on the north-northeast part of Site 11 at 2916.659'N, 8041.641'W. A barge load of clean concrete culverts and structures was deposited. The height of the deosit is approximately 10 feet. The depth on Site 11 is approximately 80 feet.

On 7/27/13 a deposit was made on the south-southeast part of Site 11 at 2916.127'N, 8041.654'W. A barge load of clean concrete structures was deposited. The height of the deosit is approximately 12 feet. The depth on Site 11 is approximately 80 feet.

On 7/29/13 a deposit was made on the south-southwest part of Site 11 at 2916.124'N, 8042.225'W. A barge load of clean concrete culverts was deposited. The height of the deosit is approximately 10 feet. The depth on Site 11 is approximately 80 feet.

On 7/31/13 a deposit was made on the north-northeast part of Site 10 at 2921.731'N, 8049.477'W. A barge load of clean concrete culverts was deposited. The height of the deosit is approximately 15 feet. The depth on Site 10 is approximately 65 feet.

On 8/3/13 a deposit was made on the SSE part of Site 13 at 2909.961'N, 8041.026'W. A barge load of clean concrete railroad ties was deposited. The deposit is compact. The height of the deposit is approximately 15 feet. The depth on Site 13 is approximately 80 feet.

On 8/6/13 a deposit was made on the south part of Site 1 at 2906.862'N, 8041.698'W. A barge load of clean mixed concrete structures was deposited. The deposit height is approximately 12 feet. The depth on Site 1 is approximately 75 feet.

On 8/8/13 a deposit was made on the SSE part of Site 2 at 2909.090'N, 8040.382'W. A barge load of clean concrete culverts was deposited. The deposit height is approximately 11 feet. The depth on Site 2 is approximately 75 feet.

On 8/10/13 a deposit was made on the southern part of Site 6 at 2902.749'N, 8043.176'W. A barge load of clean concrete culverts was deposited. The deposit height is approximately 16 feet. The depth on Site 6 is approximately 60 feet.

On 8/12/13 a deposit was made on the northwest part of Site 10 at 2921.735'N, 8050.063'W. A barge load of clean concrete culverts was deposited. The height of the deosit is approximately 15 feet. The depth on Site 10 is approximately 65 feet.