2012 Volusia County Artificial Reef Deposits

Updated 9/5/13



 Site 11 South

Off-loading the barge on Site 11 south on 9/1/12

On 7/25/12, a deposit was made on the southern part of Site 12 at 2911.595' N, 8046.472' W. A barge load of clean concrete culverts was deposited in two 80 ft. lines from both sides of the barge. The height of the drop is approximately 8 feet. The depth on Site 12 is 75 feet.

On 7/27/12, a deposit was made on southwestern part of Site 1 at 2906.860' N,8042.011' W. A barge load of clean concrete culverts and seawall material was deposited from both sides of the barge. The height of the drop is approximately 8 feet. The depth on Site 1 is approximately 75 feet.

On 7/30/12, a deposit was made on the southeastern part of Site 3 at 2911.432' N, 8044.320' W. A barge load of clean concrete culverts and seawall material was deposited from both sides of the barge. The height is approximately 10 feet. The depth on Site 3 is approximately 80-85 feet.

On 8/1/12, a deposit was made on the northwestern part of Site 3 at 2911.975' N, 8045.077' W. A barge load of clean concrete culverts and seawall material was deposited from both sides of the barge. The height is approximately 8 feet. The depth on Site 3 is approximately 80-90 feet.

On 8/3/12, a deposit was made on the southern part of Site 4 at 2919.023' N, 8044.658' W. A barge load of clean concrete culverts and seawall material was deposited from both sides of the barge. The height is approximately 10 feet. The depth on Site 4 is approximately 75-80 feet.

On 8/7/12, a deposit was made on the western part of Site 5 at 2907.188' N, 8048.635' W. A barge load of clean concrete culverts and large clean concrete material was deposited from both sides of the barge. The height is approximately 6 feet. The depth on Site 5 is approximately 60 feet.

On 8/9/12, a deposit was made on the southern part of Site 6 at 2902.791' N, 8042.919' W. A barge load of concrete culverts and large clean structures was deposited from both sides of the barge. The height is approximately 5 feet. The depth on Site 6 is approximately 75-80 feet.

On 8/11/12, a deposit was on the southwestern part of Site 7 at 2900.952' N, 8041.285' W. A barge load of clean concrete culverts and clean concrete material was deposited from both sides of the barge. The height is approximately 10 feet. The depth on Site 7 is approximately 75-80 feet.

On 8/12/12, a deposit was on the western part of Site 10 at 2921.430' N, 8049.978' W. A barge load of clean concrete culverts and clean concrete material was deposited from both sides of the barge. The height is approximately 10 feet. The depth on Site 10 is approximately feet.

On 8/15/12, a deposit was made on the northern part of Site 11 at 2916.710' N, 8041.911' W. A barge load of clean concrete culverts and clean concrete material was deposited from both sides of the barge. The height is approximately 7 feet. The depth on Site 11 is approximately 80 feet.

On 8/17/12, a deposit was on the middle of Site 2, and to the North, at 2909.593' N, 8040.640' W. A barge load of clean concrete culverts and clean metal was deposited from both sides of the barge. The height is approximately 10 feet. The depth on Site 2 is approximately 75 feet.

On 8/21/12, a deposit was made in the northeast part of Site 6 at 2903.352' N, 8042.915' W. A barge load of clean concrete culverts and a clean metal tank was deposited from both sides of the barge. The height is approximately 9 feet. The depth on Site 6 is approximately 75-80 feet.

On 8/22/12, a deposit was made in the western part of Site 12 at 2911.890' N, 8046.792' W. A barge load of clean concrete culverts was deposited from both sides of the barge. The height of the deposit is approximately 12 feet. The depth on Site 12 is approximately 75 feet.

On 8/24/12, a deposit was made in the eastern part of Site 5 at 2907.168' N, 8048.030'W. A barge load of clean concrete culverts was deposited from both sides of the 80 ft. barge. The height of the deposit is approximately 5 feet. The depth on Site 5 is approximately 60 feet.

On 8/30/12 a deposit was made in the southeastern part of Site 7 at 2900.940' N, 8040.783' W. A barge load of clean concrete culverts was deposited from both sides of the 80 ft. barge. The height of the deposit is approximately 7 feet. The depth on Site 7 is approximately 75 feet.

On 9/1/12, a deposit was made on the southern part of Site 11 at 2916.102' N, 8041.928' W. A barge load of clean concrete culverts and clean concrete material was deposited from both sides of the barge. The height of the deposit is approximately 9 feet. The depth on Site 11 is approximately 80 feet.